Projects title

MAJOR PROJECTS


Saudi Electric

Aramco Oil
click to enlarge

DATE: September 2007

LOCATION: Jubail Saud: Arabia

PROJECT: Installation of 2No 8in HDPE pipes, 12 boring under highways.

GROUND CONDITIONS: Sand

LENGTH OF BORINGS: 60m - 110m long

RIG SIZE: HDD American Augers DD8 (45 TON).

Aramco Oil Company

Aramco Oil
click to enlarge

DATE: April 2007

LOCATION: Jeddah Saud: Arabia

PROJECT: Instalation of 18in and 6in steel pipes, 9 boring under highways

GROUND CONDITIONS: Sand/Gravel

LENGTH OF BORINGS: 60m - 140m long

RIG SIZE: HDD American Augers DD8 (45 TON).

Aramco Oil Company

Aramco Oil
click to enlarge

DATE: October 2006

LOCATION: Saudi Arabia

PROJECT: Drilling under sand dunes. 20in Steel.

GROUND CONDITIONS: Very compact sand.

TIME SCALE: 4 months.

LENGTH OF BORINGS: 4No - 2No 800m 2No - 1700m

RIG SIZE: American Augers DD625 (285 TON).

Aramco Oil Company

Aramco Oil Company
click to enlarge

DATE: October 2006

LOCATION: Saudi Arabia

PROJECT: Wireline Steeling Work. 800m - 1700m long.

TIME SCALE: 10 day per crossing

EQUIPMENT: Tensor Steering Tool with True Track.

NOTE: Drilled out on line within 300mm on all crossings.

L + T

L + T
click to enlarge

DATE: March 2006

LOCATION: India

PROJECT: Installation 30in + 6in steel oil pipeline.

TIME SCALE: 2 months.

LENGTH OF BORINGS: 4No 380m and 440m

RIG SIZE: American Augers DD625 (285 TON).

Qatar Electrical Company

Aramco Oil Company
click to enlarge

LOCATION: Qatar

PROJECT: Insallation of 3No - 160mm with 3 Borings per site.

GROUND CONDITIONS: Hard Rock

TIME SCALE: 6 months.

LENGTH OF BORINGS: 50m - 120m long - Total ±25No.

SIZE OF RIG: Ditch Witch 40/20 AT.

UAE NASR Iragation Company

UAE NASR Iragation Company
click to enlarge

DATE: October 2005

LOCATION: UAE

PROJECT: Installation of 1No 900mm pipe HDPE

GROUND CONDITIONS: Mud and Stone

TIME SCALE: 2 months.

LENGTH OF SHOTS: 1No 660m long

RIG SIZE: American Augers DD625 (285 TON).

Aramco Oil Company

Aramco Oil Company
click to enlarge

DATE: October 2004

LOCATION: Saudi Arabia

PROJECT: Installation of 750mm steel pipeline

GROUND CONDITIONS: Sand and Stone

TIME SCALE: 1 month.

LENGTH OF SHOTS: 1No 630m

RIG SIZE: American Augers DD625 (285 TON).

Hogenboom / 24 Seven Electric

Hogenboom / 24 Seven Electric

DATE: October 2002

LOCATION: Hoddesdon, Herts.

PROJECT: Installation of 3 number 180 O/D PE sleeves under landfill site which had contamination.

GROUND CONDITIONS: Gravel and clay.

TIME SCALE: 4 weeks drilling.

LENGTH OF SHOTS: 405m 392m 385m.

I.L.C. used a 200 gallon per minute recycling system so as not to incur a high cost to our client for slurry removal.

Electron/ 24 Seven Electricity

Electron/ 24 Seven Electricity
Electron/ 24 Seven Electricity

DATE: September 2002

LOCATION: Huntingdon A14

PROJECT: Installation of 180mm pipes for electric cables.

GROUND CONDITIONS: Gravel

TIME SCALE: 2 weeks.

LENGTH OF SHOTS: 8 shot, single way, 100m length.
2 shot, 3 way, 100m length.

SIZE OF RIG: 40/20 Ditch Witch. 18 ton Rig.

I.L.C. incurred very bad ground conditions for drilling, which was large gravel. The use of special additives to the mud was needed to hold the bore open, so as to pull the product in without bore coming in on the pipe.

John Mowlem - Civil Engineering

John Mowlem

DATE: March 2002

LOCATION: Exeter

PROJECT: 180mm Pipe pumping sewer pipe under SSI site (Site of Scientific Interest).

GROUND CONDITIONS: Clay

TIME SCALE: 2 weeks.

LENGTH OF SHOTS: 460m

SIZE OF RIG: 70/20 Ditch Witch, 35 ton.

The SSI site was a Bird Sanctuary. Work carried out caused minimum disruption to the inhabitants.

Morrison/Transco

Morrison/Transco
Morrison/Transco

DATE: November 2001

LOCATION: River Teign, Devon.

PROJECT: 180m Single Way.

GROUND CONDITIONS: Sandstone.

TIME SCALE: 2 weeks.

LENGTH OF SHOTS: 510m.

SIZE OF RIG: Ditch Witch 70/20

The shot had to be drilled in a 6mm wide window between the bridge and BT’s Fibre optic route, running parallel with the bridge.


OUR CLIENTS INCLUDE

186k Nacap

Aquila

Bechtel

British Waterways

Electron

Environmental Agency

Hogenboom Infrastructure

Kenton Utilities

Lawrence Pipe lines

Marconi

McNicholas Construction

MKI WorldCom

Morrison Construction

Mowlem

J. Murphy & Sons

NTL

Railtrack

Transco

ARAMCO (Saudi)

Saudi Telecom

Techint

NACCAP (SRB)

 

 


Directional Drilling UK

designed by Blackcase